Remodeling Permits in the Portland Area | EL 45 PDX
EL 45 PDX
General Contractor, Portland OR

Blog · Remodeling

Do You Need ARemodeling Permit?

What usually needs a permit in Portland, Hillsboro, Beaverton, and Washington County, and who issues it.

The Short Answer

If your remodel moves or adds plumbing, changes wiring, alters walls or structure, or adds a room, you almost certainly need one or more permits. Purely cosmetic work, like paint, new flooring, or replacing cabinets in the same layout, often does not need a building permit. The details depend on where the house is, because each city and the county run their own building department.

Oregon’s state building code sets the baseline for when permits are required, and the local office enforces it. Here is how that works across the Portland area, and what usually triggers a permit.

Kitchen remodel in progress by a Portland-area remodeling contractor

Who Issues Your Permit

01PortlandPortland Permitting & Development (PP&D)
02HillsboroCity of Hillsboro Development Services & Permitting Center
03BeavertonCity of Beaverton Building Division
04GreshamCity of Gresham Building Services
05Aloha, Bethany, Cedar Mill & Other Unincorporated AreasWashington County Building Services

Work That Usually Needs A Permit

  • Moving or adding plumbing fixtures, like relocating a sink, toilet, or shower drain, or adding a bathroom
  • Electrical changes, like new circuits, added or moved outlets and switches, or new lighting circuits
  • Mechanical work, like new or rerouted exhaust fan ducting, range hoods vented outside, or HVAC changes
  • Removing or changing walls, especially load-bearing walls and anything structural
  • Additions and finishing space to create new living area
  • Water heater replacement and other plumbing system work

In Portland, the city lists even replacing plumbing fixtures in the same location as work that needs a plumbing permit, so do not assume a like-for-like swap is exempt.

Work That Often Does Not Need A Building Permit

  • Painting, wallpaper, and trim
  • New flooring, including LVP, laminate, hardwood, and tile
  • Replacing cabinets and countertops without moving plumbing or wiring
  • Most repairs that do not change structure, plumbing, or wiring

“Often” is doing real work in that sentence. A kitchen refresh that starts as cabinets and counters can turn into a permitted project the moment the sink moves or a new circuit is added for appliances.

Bathroom Remodels In Portland

Portland treats bathrooms in two ways. If you are updating an existing, already-permitted bathroom, you may only need trade permits for the plumbing, electrical, and mechanical work. A bigger remodel can need a building permit as well, plus drawings and plan review.

For a new bathroom, or to legalize an existing one, Portland offers a Simple Bathroom Permit that does not require drawn plans. It only applies when the work is interior only, there are no changes to load-bearing framing, the property has no more than three toilets in total, and the bathroom is in the primary residence rather than a detached building.

Hillsboro, Beaverton, And Washington County

The City of Hillsboro requires a building permit to repair, renovate, or demolish a building, with separate plumbing, electrical, and mechanical permits for that work. Beaverton and Washington County follow the same state code, with their own online portals and review processes.

Washington County Building Services handles permits for unincorporated areas like Aloha, Bethany, Cedar Mill, and Cedar Hills. Some cities also contract with the county for certain inspections, so the inspector who shows up may not work for the city on your permit.

Why Permits Are Worth It

A permit means an inspector checks the work at key stages, like plumbing and wiring before the walls close and waterproofing before tile goes on. That protects you from problems that are expensive to fix once they are buried.

Unpermitted work can also cause trouble later: when you sell, when a buyer’s inspector asks about it, or when an insurance claim involves that part of the house. Legalizing work after the fact often means opening up finished walls.

When you hire a contractor, the contract should spell out which permits your project needs and who is responsible for getting them. Our Oregon remodeling contract checklist covers what else belongs in writing.

This guide is general information, not legal advice, and permit rules change. Always confirm requirements for your address with your building department before starting work. Last reviewed November 2026.

Common Questions

Do I Need A Permit To Replace My Kitchen Cabinets Or Flooring?

Replacing cabinets, countertops, or flooring without moving plumbing, wiring, or walls often does not need a building permit. Once you move a sink, add outlets or circuits, or open up walls, permits usually come into play. Check with your building department, because the rules differ by city.

Who Pulls The Permit, Me Or The Contractor?

When you hire a licensed contractor, their license information goes on the permit application and they usually handle the permits as part of the job. Homeowners can also pull some permits for work on their own home. Either way, the contract should say which permits are needed and who is responsible for getting them.

What Happens If Work Was Done Without A Permit?

It can cause problems when you sell, refinance, or file an insurance claim, because there is no record that the work was inspected. Fixing it usually means applying for a permit after the fact, and walls or floors may need to be opened so an inspector can see the work.

I Live In Aloha Or Bethany. Who Issues My Permit?

Aloha, Bethany, Cedar Mill, Cedar Hills, Raleigh Hills, and other unincorporated areas are permitted through Washington County Building Services, not a city. If your address is inside Hillsboro, Beaverton, or another city, that city’s building department handles it.

Planning A Remodel?

Tell us what you want to change, and we’ll walk you through the scope, including the permits it will need.