Why This Matters Before You Remodel

Asbestos was used in many common building materials for decades, and it is still found in Portland-area homes today. It is not a problem when it is left alone. It becomes one when remodeling or demolition breaks it up and releases fibers into the air, which is exactly what tearing out a floor, ceiling or wall does.

Because of that, Oregon requires a survey before the work starts, not after something suspicious turns up.

What Oregon Requires

Oregon DEQ requires an asbestos survey by an accredited inspector before any renovation or demolition of:

  • Homes built before January 1, 2004 (residential buildings with four or fewer units)
  • All commercial buildings, regardless of when they were built

When a whole building is being demolished or extensively renovated, the survey covers the entire building. For a partial remodel, such as a kitchen, it covers the area being disturbed. A copy of the survey report has to be kept on site while the work is underway. Rules can change, so check the current requirements on Oregon DEQ’s asbestos page.

Common Materials That Get Tested

01Vinyl Flooring & AdhesiveSheet vinyl, older 9-inch tiles and the black mastic underneath
02Popcorn & Textured CeilingsSprayed-on acoustic ceiling texture
03Drywall Joint CompoundOlder joint compound and wall texture
04Duct & Pipe WrapWrap and tape on heating ducts and pipes
05InsulationVermiculite insulation in attics and walls
06Siding & RoofingCement-based siding and shingles on older homes

How The Process Works

01Schedule The SurveyAn accredited inspector visits before demolition starts
02Samples & Lab TestingSuspect materials in the work area are sampled and tested
03Survey ReportYou get a written report of what was tested and what was found
04Abatement If NeededA DEQ-licensed abatement contractor removes any asbestos that will be disturbed
05Remodel BeginsDemolition and remodeling start once the area is cleared

Plan For It Up Front

The survey is easiest when it is part of the plan from the start. Waiting on lab results or abatement can push a start date, so we ask what year the home was built during the first walkthrough and build the survey into the schedule. If it comes back clean, work starts as planned. If not, abatement is handled first and the timeline is adjusted before demolition, not in the middle of it.

Homes built before 1978 can also have lead-based paint, which has its own lead-safe work rules. See our demolition services, home remodeling page, and our guide to remodeling permits.

Common Questions

Do I Need An Asbestos Survey For A Kitchen Or Bathroom Remodel In Oregon?

If the home was built before January 1, 2004, Oregon DEQ requires an asbestos survey by an accredited inspector before renovation or demolition. For a partial remodel like a kitchen or bathroom, the survey covers the area being disturbed.

Who Can Do An Asbestos Survey?

An accredited asbestos inspector. Your contractor cannot do the survey themselves unless they hold that accreditation. The inspector takes samples and has them tested at a lab.

What If The Survey Finds Asbestos?

Asbestos-containing materials that will be disturbed must be removed by a DEQ-licensed asbestos abatement contractor before the remodel or demolition continues. Materials that will not be touched can often stay in place.

Does A Newer Home Need A Survey?

Homes with four or fewer units built after January 1, 2004 generally do not need a survey before renovation. Commercial buildings need one regardless of age.

Will A Landfill Take Debris Without A Survey?

Many disposal facilities ask for a survey or test results before accepting renovation or demolition debris, which is another reason to get it done first.

Planning A Remodel In An Older Home?

Tell us the year your home was built and what you want to change, and we will plan the steps from the start.