What to Expect During Remodel Demolition | EL 45 PDX
EL 45 PDX
General Contractor, Portland OR

Blog · Remodeling

What To ExpectDuring Demolition.

How to get ready, what happens on demo day, and what is often found behind the walls.

Demolition Is Where A Remodel Really Starts

Demolition is usually the shortest phase of a remodel, and the loudest. It is also when the most important surprises turn up. Once cabinets, tile and flooring come out, you can finally see the condition of the framing, subfloor, plumbing and wiring that has been hidden for decades.

Here is what to expect, and how to get ready.

Before Demolition Starts

01Asbestos SurveyRequired in Oregon for homes built before 2004, before anything is torn out
02PermitsPulled when the remodel needs them, before work begins
03Clear The RoomEmpty cabinets, closets and shelves in and near the work area
04Plan Around The RoomSet up a temporary kitchen or know which bathroom you will use
05Pets & KidsPlan to keep them away from the work area and the path in and out

What Happens On Demo Day

01ProtectionFloors, doorways and nearby finishes are covered; dust barriers go up
02Utilities Made SafeWater, gas and electrical in the work area are shut off and capped
03Selective Tear-OutOnly what is in the scope comes out; what stays is protected
04Debris HauledMaterial is loaded out as the work goes, with recycling sorted
05Broom-CleanThe space is left clean and open for inspection
Flooring removed to the subfloor and a bathroom opened to the studs in Hillsboro, Oregon
A Hillsboro remodel after demolition: floors down to the subfloor and the bathroom opened to the studs.
Corner soaking tub before removal in a Hillsboro bathroom remodel
The same bathroom before demolition, with the original corner tub.

What Demolition Often Uncovers

  • Water damage behind showers, tubs, toilets and under sinks. On our current Hillsboro remodel, demolition exposed water damage that had to be repaired before anything new went in.
  • Old or undersized wiring that needs updating for new lighting and appliances.
  • Old plumbing, such as galvanized pipe, that is worth replacing while the walls are open.
  • Uneven or damaged subfloor that needs repair before new flooring or tile.
  • Past repairs that were not done to code.

None of this is unusual. The key is a contractor who shows you what was found, explains the fix and the cost, and gets your approval before covering anything up. That is also why it helps to keep some budget in reserve for the unexpected.

Demolition Only, Or Demo And Rebuild

We do both. Some customers only need the tear-out and haul-away, and others want one contractor from demolition through the finished room. See our demolition services, and for planning the rest of the project, read how to prepare for a remodel and the kitchen remodel timeline.

Common Questions

How Long Does Remodel Demolition Take?

It depends on the size of the space. A single bathroom or kitchen tear-out is often done in one to a few days, while a whole floor or a gut to the studs takes longer. The bigger variable is what turns up once things are opened.

Can I Stay In The House During Demolition?

Usually, yes, for a kitchen or bathroom. The work area is closed off, but expect noise, some dust, and limited use of that room and its water or power while the work is happening.

Who Shuts Off The Water And Power?

The contractor shuts off and caps the plumbing and electrical in the work area before demolition starts, so the rest of the house can keep running.

What Happens To The Debris?

We load and haul it away as part of the job, sort what can be recycled, and leave the space broom-clean. There is no separate dumpster to rent.

Can I Do The Demolition Myself To Save Money?

Some homeowners do, but it carries risks: hidden plumbing and wiring, asbestos or lead in older homes, and damage to areas that are staying. If you go that route, get the asbestos survey first and have utilities shut off properly.

Ready To Start Your Remodel?

Tell us what needs to come out and send a few photos of the space.