Planning AWhole-Home Remodel.
How to set priorities, put the work in the right order, and decide whether to live through it when you are remodeling more than one room.
More Than A Bigger Project
When a remodel touches the kitchen, one or more bathrooms, the floors and the finishes at the same time, the hard part shifts from picking finishes to coordinating everything: the order the work happens in, what turns up behind the walls, and how your household keeps functioning in the meantime.
Planning it as one project instead of a string of separate jobs is what keeps you from tearing out new work to fix an old problem, like installing new floors and then opening them back up for plumbing a few months later.
Start With A Priority List
Not every room needs the same level of work. Before talking finishes, sort the wish list into three groups:
- Must fix: leaks, water damage, failing plumbing or electrical, and anything unsafe.
- Must change: layout problems you live with every day, like a kitchen that does not work or a tub nobody can comfortably step into.
- Nice to have: finish upgrades that can be scaled up or down to fit the budget.
The first two groups belong at the top of the budget. Finishes are the easiest place to adjust later. Keep a contingency for hidden conditions, because on a whole-home project something almost always turns up once walls and floors are opened.
The Order Work Usually Follows
Expect Surprises Behind The Walls
Whole-home remodels, especially in older homes, regularly uncover things nobody could see during the estimate. Our current Hillsboro remodel started as a bathroom and about 1,200 square feet of LVP. Demolition revealed water damage, the plumbing and electrical were replaced, and the corner tub and old shower stall are being replaced with a single walk-in shower. Because the bathroom and floors were planned as one project, the damage was dealt with before any new flooring went down.
Our guide on what to expect during demolition covers what is commonly found and how to prepare for demo day. Permit questions are covered in do you need a remodeling permit in the Portland area.



Living At Home During The Remodel
Many homeowners stay in the house, and with planning that usually works. On our Tigard kitchen remodel, the family lived at home and the work was sequenced to keep the kitchen usable. On a whole-home project, the same idea applies at a larger scale:
- Keep one bathroom working at all times if the home has more than one.
- Phase the floors so there is always a place to sleep and a clear path through the house.
- Set up a temporary kitchen if the kitchen will be out of service for a stretch.
- Plan for dust and noise, especially with kids, pets or someone working from home.
Moving out for part of the project can make sense when the only bathroom, the kitchen and the main floors would all be out at once. Talk through the schedule with your contractor before deciding.
One Contractor For The Whole Job
A whole-home remodel runs best when one licensed general contractor is responsible for the schedule, the trades and the finished result. Before you sign, verify the contractor’s Oregon CCB license and get the scope in writing. EL 45 PDX LLC is licensed, bonded and insured (CCB #260830) and handles home remodeling across Washington, Multnomah and Clackamas Counties, including kitchens, bathrooms, tub-to-shower conversions, flooring and tile under one plan.
Common Questions
Should I Remodel Everything At Once Or In Phases?
Doing it all at once means one period of disruption and one coordinated schedule. Phasing spreads out the cost but means living through construction more than once. If you phase, do behind-the-wall work and anything that affects the floors first, so later phases do not undo earlier ones.
Can I Live At Home During A Whole-Home Remodel?
Often, yes, if the work is phased so you always have a working bathroom, a place to sleep and some way to prepare food. When the kitchen, the only bathroom and the main floors would all be out at once, moving out for that stretch can be easier.
What Should Be Decided Before Demolition Starts?
The written scope, your budget priorities, a contingency for hidden conditions, and as many selections as possible: cabinets, tile, flooring and fixtures. Decisions made mid-project are the most common cause of stalls.
Do I Need A Permit For A Whole-Home Remodel?
It depends on the scope and your city. Our permit guide explains what typically needs a permit in Portland, Hillsboro, Beaverton and Washington County, and your contractor should confirm it for your project.
Planning A Bigger Remodel?
Tell us which rooms you are thinking about and what matters most, and we’ll help you plan the scope and the order of work.